Phase Two - Keenan Street to Maritana Street Shared Path Project

The City of Kalgoorlie Boulder is planning for the construction of a Shared Use Path (SUP) on Maritana - Piccadilly - Keenan Street as shown in the drawing in the Document Library section of this page.

About the funding

The City of Kalgoorlie-Boulder has received two Department of Transport’s Western Australian Bicycle Network (WABN) grants, to extend the city’s Cycling Network:

  • Phase Two - Keenan Street to Maritana Street Shared User Path Project
2022-23 Financial Year - $20,000 for the design works2023-24 Financial Year

- $180,000 for the construction works.

This project is jointly funded by the Department of Transport (WA Bicycle Network Grants) and City of Kalgoorlie-Boulder. The proposed SUP will connect to an existing SUP from Kalgoorlie Train station and will continue to Maritana Street up to Campbell Street.

Public feedback

Have your say on the detailed designs and features of the shared user path. Download the design under the document library on this page and complete the survey below.

This survey closed on Friday 16 April.

Survey